Voditi Advisory
Aerial view of a new T-intersection on a highway, with the site compound and plant beside it

Client-side advisory | QLD & NSW

Client-side judgement.
Contractor delivery insights.

Your project gets both.

Project management and advisory for councils and infrastructure owners, led by people who have priced, programmed and built civil works for contractors.

Discuss your project

Voditi | Serbian: to guide, to lead

  • $300M+

    In civil infrastructure projects managed or supported by our team

  • LB312 | LB343 | LB505

    Local Buy prequalified: consultancy, project management, superintendency and disaster recovery

  • CPEng | RPEQ

    Expertise held in-house, available for any engagement

  • TMD

    Qualified traffic management design, for staging works on live roads

Where is your project up to?

Select a stage to see what we do there and the signs you should call us now.

Plan: What we do at this stage

Set the budget, scope and procurement path on numbers that will hold.

  • Cost planning and early estimates built from current contractor rates
  • Options analysis and business case input
  • Funding submission support and program of works
  • Delivery and procurement strategy

Call us now if

  • Your budget rests on an estimate more than a year old
  • A funding deadline is fixed but the scope is not
  • You are unsure whether to design and construct or construct only
Discuss a project at Plan stage

Recent work at this stage

Voditi engagement | Murweh Shire Council

Aurora Estate land development

$15M

Design, funding requests and procurement for a 65-lot residential estate, funded under the Residential Activation Fund.

Read the case study

Design: What we do at this stage

Keep the design buildable, on budget and moving.

  • Design management, consultant briefs and review workflow
  • Constructability reviews at 30%, 70% and 100% design
  • Cost checks at each design stage
  • Staging, traffic and access planning with the designers

Call us now if

  • The estimate grows at every design stage
  • Reviewers raise issues at the end instead of progressively
  • Nobody has tested how the job will actually be staged and built
Discuss a project at Design stage

Recent work at this stage

Voditi engagement | Brisbane Airport Corporation

ITB Parking & Roads Program

$120M

Design managed from concept to 100% for a complete overhaul of the international terminal road network.

Read the case study

Procure: What we do at this stage

Go to market with documents contractors can price without heavy qualification.

  • Procurement strategy and contract form selection
  • Tender documents, schedules and evaluation plans
  • Pre-tender estimates and tender price analysis
  • Clarifications, negotiation and recommendation reports

Call us now if

  • Tenders came in well over the estimate
  • Few tenderers, or long lists of qualifications and departures
  • You cannot tell which price carries the most risk
Discuss a project at Procure stage

Recent work at this stage

Voditi engagement | Lismore City Council

Flood restoration tender peer review

2 packages

Tender documents for two TfNSW-funded flood restoration packages reviewed for consistency, clarity and risk before going to market.

Read the case study

Deliver: What we do at this stage

Administer the contract firmly and fairly, with cost and program under control.

  • Superintendent and Principal’s Representative roles
  • Variation and claim assessment
  • Program review and progress reporting to council or board
  • Site inspections and quality verification

Call us now if

  • Variations are consuming contingency faster than planned
  • The contractor’s program is slipping with no recovery plan
  • Claims are paid without an independent check
Discuss a project at Deliver stage

Recent work at this stage

Team career experience | Banana Shire Council

Disaster Recovery Funding Arrangements

$96M

A team member led DRFA reconstruction delivery as Project Director, overseeing contract compliance and stakeholder coordination.

Handover: What we do at this stage

Close out cleanly and hand operations an asset they can run.

  • Practical completion, defects and final inspections
  • As-constructed and O&M documentation review
  • Asset handover to operations and maintenance teams
  • Final account and close-out reporting

Call us now if

  • Practical completion is disputed
  • Asset data or as-constructed drawings are incomplete
  • The final account is still open months after completion
Discuss a project at Handover stage

Recent work at this stage

Team career experience | Transurban

Toll road UPS replacement program

Network-wide

Project Manager for the replacement of uninterruptible power supplies across every toll road in south-east Queensland, critical to keeping the roads’ safety systems running, through to handover to operations. 2022 to 2023.

What we do

All services
Aerial view of the Brisbane Airport international terminal precinct, with the runways and Moreton Bay beyond

Brisbane Airport Corporation

ITB Parking & Roads Program

Value
$120M
Scope
Senior PM, concept to handover

Result: Design managed from concept to 100%, with design, consultant and construction procurements taken through to contract execution.

Aerial view of a sewage treatment plant, with circular clarifiers and treatment tanks among trees

Murweh Shire Council

Charleville & Augathella STP upgrades

~$6M

PM and Superintendent across two treatment upgrades.

Result: Construction has started and works are underway. All parties continue to work together towards best-for-project outcomes.

Gravel road through eucalypt bushland, with a freshly graded shoulder and cleared verge

Team career experience | Banana Shire Council

Disaster Recovery Funding Arrangements

$96M

A team member led DRFA reconstruction delivery as Project Director, overseeing contract compliance and stakeholder coordination.

Result: Safe access reinstated under emergency works kept producers operating while permanent restoration was assessed and approved.

All experience

Who we work for

Asset owners

  • Brisbane Airport Corporation
  • Murweh Shire Council
  • Lismore City Council

Collaborators

  • Howard Consulting

Contractors

  • Mainline Drainage
  • Cutting Edge Graders
  • FGH
  • Shaping Australia Group
  • Bild Group
Truck working in a coned-off lane of a city road under traffic

Contractor-side experience

Contractor insight, applied client-side.

From the contractor sideWhat it means for you
How a tender price is built: rates, prelims, risk, marginYou see which tender carries the most risk, not only which is cheapest.
Where variations come fromScope gaps and unclear interfaces are fixed in design, where they cost least.
How crews and plant actually workPrograms and staging that a contractor can meet.
What a legitimate claim looks likeContracts administered firmly and fairly.

We also support Tier 2 to 4 contractors with estimating, tender and delivery work, which keeps our pricing knowledge current. Contractor tender support

Tell us where your project is up to.

Speak directly with a director about scope, stage and budget.